July 31, 2017
The current land balance is $15,155.60 with annual payments of $4500/yr.
For those wishing to donate via mail or PayPal, the link is here.
The current land balance is $15,155.60 with annual payments of $4500/yr.
For those wishing to donate via mail or PayPal, the link is here.
July 30, 2017
We are thankful to the Lord for coming down and blessing us with a wonderful Monark Springs Campmeeting this year! The tabernacle was erected in time thanks to the Lord's blessing, and the enormous efforts of many. We still lack a few items to be completed with the tabernacle phase of the Master Plan.
TABERNACLE
So far we have received $333,748.31.
Tabernacle expenditures have been $292,892.45.
Urgent needs for finishing the tabernacle are Outside Doors to protect from mice, birds, etc... Estimated at $37,788.00
Future tabernacle expenses:
Air Movement Equipment: Apprx. $4,000.00
Sound: Building interior Sound Deflection, Sound System equipment. translation equipment. $(TBD)
Landscaping still to complete: $2,500.00 (dirt, grass, misc. loose ends)
NEW DINING HALL
At the business meeting a Dining Hall plan was introduced. That can be found here.
The Master Plan budgeted about $340,000.00 for the Dining Hall.
We could break ground if we had about $150,000.00.
This includes Site work, Concrete Slab, Septic System, Metal Building Rough-In, and restrooms.
For those wishing to donate via mail or PayPal, the link is here.
We are thankful to the Lord for coming down and blessing us with a wonderful Monark Springs Campmeeting this year! The tabernacle was erected in time thanks to the Lord's blessing, and the enormous efforts of many. We still lack a few items to be completed with the tabernacle phase of the Master Plan.
TABERNACLE
So far we have received $333,748.31.
Tabernacle expenditures have been $292,892.45.
Urgent needs for finishing the tabernacle are Outside Doors to protect from mice, birds, etc... Estimated at $37,788.00
Future tabernacle expenses:
Air Movement Equipment: Apprx. $4,000.00
Sound: Building interior Sound Deflection, Sound System equipment. translation equipment. $(TBD)
Landscaping still to complete: $2,500.00 (dirt, grass, misc. loose ends)
NEW DINING HALL
At the business meeting a Dining Hall plan was introduced. That can be found here.
The Master Plan budgeted about $340,000.00 for the Dining Hall.
We could break ground if we had about $150,000.00.
This includes Site work, Concrete Slab, Septic System, Metal Building Rough-In, and restrooms.
For those wishing to donate via mail or PayPal, the link is here.
5/25/2017
We are very thankful that in spite of over TWENTY inches of rain since this project began April 25th, as of this morning, the footings, stemwalls, podium, all flat areas, and 1 sloped wedge have been poured! The folks from Shawnee are pouring 2 more sloped wedges today. That will leave 3 more sections and the outside support columns which we hope to complete in a final pour next Wednesday. Many long hours have been given by several and we are very thankful! The building has been ordered and installation is scheduled for June 19th.
We are very thankful that in spite of over TWENTY inches of rain since this project began April 25th, as of this morning, the footings, stemwalls, podium, all flat areas, and 1 sloped wedge have been poured! The folks from Shawnee are pouring 2 more sloped wedges today. That will leave 3 more sections and the outside support columns which we hope to complete in a final pour next Wednesday. Many long hours have been given by several and we are very thankful! The building has been ordered and installation is scheduled for June 19th.
4/20/2017
The decision has been made to remove the old tabernacle structure leaving the concrete slab. A company has offered to do it for free in exchange for the useable wood. We are keeping some of the wood to integrate into the new tabernacle design.
The plan is to have our next Monark meeting in the new tabernacle. This will require a very intense effort by several. Bro. Michael Gellenbeck has agreed to stay on site for the duration of the project to help oversee and ensure it's successful completion. We need volunteers for a few intense workdays, prayers for protection and favorable weather, and money to complete the project without borrowing.
A project schedule is available here. The facebook page is here. Donations can be given here.
The decision has been made to remove the old tabernacle structure leaving the concrete slab. A company has offered to do it for free in exchange for the useable wood. We are keeping some of the wood to integrate into the new tabernacle design.
The plan is to have our next Monark meeting in the new tabernacle. This will require a very intense effort by several. Bro. Michael Gellenbeck has agreed to stay on site for the duration of the project to help oversee and ensure it's successful completion. We need volunteers for a few intense workdays, prayers for protection and favorable weather, and money to complete the project without borrowing.
A project schedule is available here. The facebook page is here. Donations can be given here.
1/18/2017
As of end of 2016:
General fund bal. $ 10,671.43
Building fund 131,246.85
Land fund - 24,910.60
we still need to some work on the old store building.
We have taken in a total of $44,809.25 for the new land
Purchase price was 65,000.00
Survey & closings 4,719.85
This leaves us in the hole $24,910.60 end of 2016
We received $3,500 for the land in 2017 which makes it $21,410.60
The demolition contractor started yesterday (Tuesday 17th) and the house is gone. also we successfully moved the barn on Jan. 7th.
As of end of 2016:
General fund bal. $ 10,671.43
Building fund 131,246.85
Land fund - 24,910.60
we still need to some work on the old store building.
We have taken in a total of $44,809.25 for the new land
Purchase price was 65,000.00
Survey & closings 4,719.85
This leaves us in the hole $24,910.60 end of 2016
We received $3,500 for the land in 2017 which makes it $21,410.60
The demolition contractor started yesterday (Tuesday 17th) and the house is gone. also we successfully moved the barn on Jan. 7th.
7/27/2016
- The contract for purchasing the new property was signed
- Surveying for the purchased property has been scheduled
- A topographical survey of the existing property is scheduled to be completed by the end of August.
- A notice of the land purchase has been sent out to the congregations (also available on this website)